[1]李正武,路双,王技.新旧桥梁刚接加固在改扩建运营期的应用研究[J].公路与自然,2019,26(05):50-55.
 LI-Zheng-wu,LU-Shuang WANG-Ji.Application research of rigid connection reinforcement for old and new Bridges in the operation period of reconstruction and expansion[J].Highway & Nature,2019,26(05):50-55.
点击复制

新旧桥梁刚接加固在改扩建运营期的应用研究()
分享到:

《公路与自然》[ISSN:/CN:]

卷:
第26卷
期数:
2019年05
页码:
50-55
栏目:
养护改建
出版日期:
2019-11-11

文章信息/Info

Title:
Application research of rigid connection reinforcement for old and new Bridges in the operation period of reconstruction and expansion
作者:
李正武1 路双2 王技3
1.宁夏公路管理局,宁夏 银川 750000; 2、3.中交瑞通路桥养护科技有限公司,陕西 西安 710075
Author(s):
LI-Zheng-wu1 LU-Shuang2 WANG-Ji3
1.NINGXia. Highway Administration,Yinchuan 750000,China;2、3. CCCC Rui Tong Road &Bridge Maintenance Technology CO.,LTD. Xi,an 710075,China
关键词:
刚接协同工作加固钢隔板
Keywords:
rigid connection work together strengthening steel grid plate
分类号:
U442.3
DOI:
-
文献标志码:
A
摘要:
为改善新旧桥梁协同工作性能,在混凝土收缩徐变及基础沉降差稳定后,本文对某拼宽初期未进行上部连接的高速公路桥梁采取新旧翼缘刚接、箱外增设钢隔板及对拉螺纹钢筋等拼接加固措施。结果表明,刚接加固改善了原分离体系受力,新旧桥间荷载横向传力[1]凸显,各部承载能力、应力指标均满足规范要求,主桥悬臂端挠度突变得到缓解,有效实现新旧桥梁协同工作目标,提高了行车安全性与舒适性。
Abstract:
In order to improve the cooperative work performance of the old and new bridges, after the concrete shrinkage and creep and the stabilization of the foundation settlement difference, this paper adopts the joint reinforcement measures such as the rigid connection of the old and new flange, the addition of steelplate diaphgram outside the box and the screw reinforcement bar.The results show that the rigid joint reinforcement has improved the force of the original separation system, highlighted the lateral distribution of load[1]of the new and old bridges. All the load capacity and stress indexes of each part meet the requirements of the specification, and the abrupt change of the cantilever end deflection of the main bridge has been alleviated. It also has effectively realized the cooperative work goal of the old and new Bridges, and improving the driving safety and comfort.

参考文献/References:

[1] 刘莉、单婷婷.拼宽箱梁桥荷载横向分布计算及应用[J].中国市政工程,2016,6(3):17-19.[2] 刘东明.高速公路改扩建工程新旧桥梁拼宽施工工艺[J].交通世界,2018, (1):136-137.[3] 邓学军.高速公路改扩建工程桥梁拼宽关键技术调研[J].北方交通,2013,(3):63-69.[4] 刘均利、鞠金荧、方志.混凝土收缩徐变模式对连续梁桥拼宽影响的分析[J].公路,2015,5(5):46-50.[5] 周俊威、张宏胜.拼宽桥梁沉降差容许值的确定及降低沉降差的措施[J].交通科技,2014,(6):48-50.[6] 张可.高速公路改扩建单双侧加宽分析[J].建材与装饰,2015, (7):148-149.[7] 韩亮.钢筋混凝土结构裂缝的控制分析[J].工程建设与设计,2016,(1):41-44.[8] 高海涛.改扩建工程中的桥梁拼宽施工方法及注意事项[J].交通世界,2014,(14):158-160.[9] 方益红.高速公路桥梁拼宽改造关键问题分析[J].福建建筑,2009,(9):129-131.[10] 卜浩然、高庆飞.横向预应力对装配式梁桥刚度影响分析[J].低温建筑技术,2015,(4):64-66.

备注/Memo

备注/Memo:
收稿日期:2019.06.04作者简介:李正武(1986- ),男,宁夏海原人, 2018年毕业于东北大学建筑与土木工程专业,硕士,高级工程师,主要从事桥隧日常养护、检测及维修加固工作。
更新日期/Last Update: 2019-11-08